Facility Improvements

DiDonato Associates provided design services for the replacement of the existing grass football/soccer field with a new synthetic turf field and restoration of the surrounding track with a new synthetic surface, along with associated re-grading and all necessary subsurface drainage improvements.  We also provided drainage improvements to the existing baseball field, including the addition of subsurface drainage.  The entire infield was rebuilt and re-graded.  A new outfield fence and foul ball poles were installed.  A new state-of-the-art multi-use scoreboard with video capabilities was installed along with a new 9-inning baseball scoreboard.  Locker room improvements include new lockers, HVAC, and lighting upgrades.  A new unisex employee bathroom was built in the service building.

Project Profile

Download / Print